The following is a list of general highway maintenance and construction work the Missouri Department of Transportation (MoDOT) has planned in the Northwest Missouri region through Aug. 11.

Continued flooding may cause schedule changes in some of the planned work. There may also be moving operations throughout the region such as pothole patching, striping, signal work, etc., in addition to the work mentioned below.

All work is weather permitting and subject to change.

Caldwell County

Route D – Pothole patching from Route HH to U.S. Route 36, Aug. 5

Route HH – Pothole patching from Route 13 to Route 121, Aug. 6

Route A – Pothole patching from Route N to the Ray County line, Aug. 7

Route N – Pothole patching from Route A to Route D (Carroll County), Aug. 8

Carroll County

U.S. Route 65 – Bridge rehabilitation at the Wakenda Creek Bridge through late August.

Route C – CLOSED until further notice at the Branch of Turkey Creek Bridge due to damage from flooding.

Route N – Pothole patching from Route D to Route A (Caldwell County), Aug. 8

Chariton County

Routes F, M, Y, FF and WW – Pothole patching, Aug. 5 – 9

Clinton County

U.S. Route 169 – CLOSED for a bridge replacement project at the Castile Creek Bridge south of Gower through September. More info: https://www.modot.org/us-route-169-castile-creek-bridge

Route A – CLOSED for a culvert replacement from 0.5 mile west of U.S. Route 69 to 0.5 mile east of the Cameron Airport, Aug. 5, 7 a.m. to 4 p.m.

Route NN – Pothole patching from Route 33 to Route VV, Aug. 5 – 9

Route PP – Pothole patching from U.S. Route 69 to I-35, Aug. 5 – 9

Daviess County

Route C – CLOSED for bridge rehabilitation at the I-35 overpass through September. More info: https://www.modot.org/clinton-and-daviess-county-bridge-deck-replacements-over-i-35

Route 6 – Bridge maintenance at the Grand River Bridge and the Overflow Bridge, Aug. 5 – Aug. 11. This includes a 12-foot width restriction.

Grundy County

Route Y – Pothole patching from Route 6 to Route JJ, Aug. 5 – 9

Holt County

I-29 – Resurfacing project from the Davis Creek Bridge (mile marker 84) to U.S. Route 59 (mile marker 67), Aug. 5 – 9

U.S. Route 59 – Pothole patching from east of the Oregon city limits to I-29 at Exit 67, Aug. 5 – 9

U.S. Route 159 – Resurfacing project from U.S. Route 59 to Route P near Fortescue, Aug. 5 – 10

Linn County

U.S. Route 36 – Pothole patching from the Macon County line to Meadville, Aug. 5 – 6

U.S. Route 36 – Bridge maintenance westbound on the Locust Creek Bridge, Aug. 5 – 8

Route 11 – Bridge rehabilitation on the West Yellow Creek east of Brookfield, Aug. 5 – 9. This includes a 14-foot width restriction.

Route M – Resurfacing project from the northern Brookfield city limits to Route 11. Aug. 5 – 9. This project includes nighttime work.

Livingston County

Route N – Bridge maintenance at the Indian Creek Bridge, Aug. 5 – 8

U.S. Route 65 – Pavement repair from Route 190 to the Grundy County line, Aug. 5 – 9

U.S. Route 65 – Resurfacing project from U.S. Route 36 in Chillicothe to County Road 228, Aug. 5 – 9. This project includes nighttime work and a 12-foot width restriction.

Sullivan County

Route 6 – CLOSED for a bridge replacement project at the West Locust Creek Bridge, east of Humphreys, and West Yellow Creek Bridge, east of Milan, through late August. More info: https://www.modot.org/route-6-bridge-replacements-near-milan

Route EE – CLOSED until further notice at the Medicine Creek Bridge due to damage from flooding. The roadway will remain closed until the rehabilitation project is complete in September.

Route PP – CLOSED until further notice at the East Medicine Creek Bridge after a regularly scheduled inspection revealed critical deterioration to the structure. The bridge is currently scheduled for replacement in fiscal year 2020. More info: https://www.modot.org/sullivan-county-route-pp-east-medicine-creek-bridge

Route 139 – Intersection and sidewalk improvements through Newtown beginning on the south end of town working north (east side of road) then south (west side of road), Aug. 5 – 9. More info: https://www.modot.org/route-139-newtown-ada-improvement

Route 6 – CLOSED for a culvert replacement from Cole Canyon Road to Route DD, Aug. 7, 7 a.m. to 2 p.m.

Route DD – CLOSED for a culvert replacement from Trail Road to Timber Road, Aug. 8, 7 a.m. to 2 p.m.